Recent slab pour we completed in Mold consisting of 300m2 slab insulation, covered with waterproof membrane,12t of cut and bent steel fixed in place, 18 loads of concrete pumped.
Slab finished to SR2 level specification. This had to be turned around in a very short window when we had a break in the weather – all thanks to a great team!